New Jersey Data Center & Colocation

NY2 - Secaucus, NJ

Download Brochure Take a Tour Get a Quote

Tethered Access to New York with Scalability for Your IT Growth

CoreSite’s Secaucus, New Jersey data center (NY2) provides more than 236,000 square feet of data center capacity and is connected via dark fiber to CoreSite’s New York data center (NY1) in Manhattan. Built above the 500-year flood plain, CoreSite constructed this colocation facility from the ground up to ensure a secure, reliable and highly-scalable platform, capable of supporting a growing community of enterprises, domestic and international carriers, and leading cloud providers.

236,000+ Square Feet

Scalable colocation deployments including cabinets, cages, private suites and build-to-suit options and rooftop space.

State-of-the-Art Security

In-house physical security is on site 24x7x365 in addition to key card access, biometric scanners, mantrap entries, IP-DVR cameras and 8’ perimeter fencing.

Reliable Performance

Six 9s (99.9999%) historical portfolio uptime supported by N, N+1, 2N UPS and generator.

Network-rich

Interconnection, network resiliency and low-latency metro connectivity achieved through the presence of a large number of carriers.

Cost-Effective

Dark fiber network tethering from NY2 to our New York data center in Manhattan provides customers with access to the 35 network and cloud service providers deployed with CoreSite in New York. This scalable connectivity provides customers in our Secaucus, NJ data center with the access they require, but at costs commensurate to those outside New York City.

Learn About NY1

Specifications

Facility Size 236,000+ sq. ft. of data center space Deployments Cabinets, cages, private suites and build-to-suit
Rooftop Space available Fit Out Powered shell, infrastructured shell and turn-key
Power Availability AC and DC    
Peering Exchanges Any2Exchange® for Internet peering, NYIIX and DE-CIX New York Cloud Access The CoreSite Open Cloud Exchange and AWS Direct Connect
Diversity Diverse POEs, MDFs and IDFs Cross Connects Fiber, copper and coaxial
Carrier Availability See our carrier list    
Access Key cards and biometric scanners Entries Double mantrap
Cameras Perimeter and interior IP-DVR Perimeter 8' perimeter fence and controlled site access
Security Officers 24x7x365 in-house staffed    
Utilities Diverse utility feeds UPS/PDU/RPP N, N+1, 2N redundancy
Generators N+1 redundancy Mechanical N+1 chillers, cooling towers, CRAHs and chilled water pumps
Operations 24x7x365 on-site personnel Remote Hands 24x7x365
BMS Controls State-of-the-art mission-critical controls and monitoring Uptime 100% uptime SLA and six 9s (99.9999%) historical portfolio uptime
Flood Plain Systems above 500-year flood plain Fuel Storage 72 hours, on-site with multiple refueling contracts
Water Storage 24 hours, on-site    
Floor Loading Floor 1: 250 lbs./sq. ft.
Floor 2: 165 lbs./sq. ft.
Clear Height 11' above 36" raised floor
Column Spacing Floor 1: 24' x 24'
Floor 2: 48' x 48'
Loading Dock Exterior 4' dock height with levelers
Hardened Exterior Roof designed to withstand 125 MPH winds
Reinforced interior cross-bracing
Elevators Passenger: 7'w x 4'd x 9'h (3,500 lbs.)
Freight: 9'w x 11'd x 9'h (10,000 lbs.)
HIPAA Infrastructure and physical security standards support HIPAA compliance ISO ISO 27001 certified
PCI PCI DSS certified SOC SOC 1 Type 2 and SOC 2 Type 2 certified
Work space Office space and conference rooms Tech Lounge 24x7x365 tech lounge with kitchen, televisions, couches and short-term desk space
Parking Secure on-site parking    
Certifications ENERGY STAR and LEED Silver certified Electrical High-efficiency UPS systems
Utility Power Power taken at 26kV to achieve rate reduction and distribution efficiencies Cooling Variable speed CRAHs and ultrasonic humidification
Chiller Chilled water with evaporative condensing units and chillers for air- and water-side economization Life Safety Dual-interlock pre-action dry-pipe sprinkler system
Lighting Lutron Eco-System lighting    

“Working with CoreSite has enabled us to accomplish goals that we did not necessarily feel were realistic two years ago. The relationship has opened a world of new opportunities for us and we are excited to continue the partnership in the future.”

Tab Butler, Director, Media Management and Post Production, MLB Network

Watch Case Study View All Case Studies

Additional Resources

New York Overview Brochure

CoreSite’s New York facilities comprise one of the most network-dense campuses on the East Coast.

Read
Virtual Data Center Tour

Take a look inside our data centers to learn why CoreSite is the right place for your IT infrastructure.

Watch
7 Tips for Choosing a Provider

Selecting a colocation provider is a big decision. Use these criteria to guide your search.

Read
White Paper: Moving IT Off-Site

Hear from your peers: 130+ IT decision makers were surveyed on their data center strategies.

Download